Start with the paperwork your team re-types every day from one document into another. It happens often, it follows rules, and someone checks it anyway, so the hours are easy to count and the result is easy to check.

James Maher · former food plant manager · Mavraq

Where the hours go

James spent six years in food manufacturing: the graduate production manager programme, then operations manager, then plant manager. The managers he worked with lost days a week to admin: retyping what was already on a form, chasing a document somebody had already sent, answering the same spec question for the tenth time.

A good first process passes five tests

  1. It happens every day or every week.
  2. It follows rules a new starter could learn.
  3. It arrives as documents or emails.
  4. Someone checks it anyway.
  5. You can count the hours it takes.

Where that usually is, department by department

  • Intake and supply: weighbridge tickets matched to every load by 7am.
  • Production: the morning report written the same way every day, by 7am.
  • Quality: failed loads traced and release packs checked before QA signs.
  • Maintenance: work requests by voice note, with the asset and a photo.
  • Health and safety: contractor papers checked before anyone arrives on site.
  • Environment and energy: every lab result checked against the licence limits.
  • R&D and technical: past trials searchable, with the report and page shown.
  • Stores and dispatch: stock near its age limit flagged, export papers checked.
  • Procurement: supplier certificates checked against the spec as they arrive.
  • Finance: invoices matched to order and goods receipt before anyone sees them.
  • Sales and customer service: customer questionnaires drafted from your approved documents.
  • People: handbook questions answered; with an HR pilot, training and onboarding chased.

These are examples from food, not a fixed list. If the job taking your team's hours is not here, that is the one to look at.

What to leave for later

  • Anything that needs a judgement call every time.
  • A process that changes every week.
  • Work nobody measures, because you won't know if it got better.

Some things stay out altogether. Nothing here touches line control or the ERP's books, and nothing decides anything about a person: hiring, hours, allocation of work or performance. Those uses are high-risk under the EU AI Act.

Check it before anyone builds

Pick the job your team complains about most and time it for a week, in a form the people doing it fill in themselves. That number is your baseline. A pilot measures the same thing, the same way, for the same length of time after go-live, and their manager signs off both.