Milk in today
Litres per hour since midnight
2,412,600 L
154,600 L this hour · 4.9M L planned by midnight
Every pilot starts by finding the hours. In week one, a capacity audit maps where each team’s time goes, process by process, and how much of it a build can take over. The pilot report turns that into roles and money.
How the pilot report puts it · example
About0.6
of a role in accounts payable
The usual options
What you do with the time is your decision.
Mavraq measures processes, never individual people, and decisions about roles stay with you and your HR and legal advisers.
Below is an example dairy plant on example data, built to show where those hours sit in a business this size. Click any building or vehicle for its numbers and what Mavraq would automate there.

Pick a building to see its work
154,600 L in this hour
Next due in 2 min
Last to Dublin Port
61% reused today
Latest on site
An illustration of where the work can lead. Every project starts with one team and one process.
A sample of what Mavraq builds for a plant like this, on its example data. Each manager sees only their own pages: switch who is logged in to see theirs.
Illustrative · example data
The whole site at a glance. Open any card for the figures behind it.
Litres per hour since midnight
2,412,600 L
154,600 L this hour · 4.9M L planned by midnight
Each day of October against its share of budget
€62.6M
Six today · five more this week on their pages
Vat 7 has been down with a seal fault since 09:30. Approve the contractor call-out, or run 11 vats to the end of the shift.
The hot work permit for the dryer 1 scaffold needs sign-off before 14:00. Approve it with a fire watch, or move the job to tomorrow's shutdown.
Milk in silo 4 reaches 36 hours at 15:30. Plan it into the cheese plant this afternoon or arrange a sale.
Batch 2196 graded mild at six months but is ordered as mature. Send batch 2201 instead, or move the order.
Ammonia reached 92% of its licence limit yesterday. Check the aeration basin before tonight's composite sample.
Supplier A's delivery: 24 pallets ordered, 22 came off the lorry, and invoice INV-2290 bills 24. Request a credit note for the two, or hold the invoice.
Each button hands the item to the right person or automation. A person still makes the call.
This month, by where the milk went
Butter and powder earn 6.3c over the milk price, less than the 8.1c it costs to process a litre.
Customer invoices, now
Made since midnight against the plan for 11:42. Pick a plant for its page.
Answers from your SOPs, licence and batch records, with the page shown
Example questions
An AI assistant. It answers only from the documents it’s given, and says so when they don’t cover something.
Now, newest on the left
Wastewater, last 30 days
30 of 30 days
Within limits. Ammonia at 92% of its limit yesterday.
1.15 MWh a tonne, 3% under target
Example EU quotations, €/t, last 12 weeks
Butter down 3.1% in four weeks. Worth a look before selling forward.
Site-wide, this month
214 days
since a lost-time injury
By department, never by person
412
on site now, of 455 rostered
Revenue forecast against budget
€71.9M
€1.7M over budget if the last four days run at this month’s average, €2.32M a day.
One dashboard, filtered by who is logged in. Each role lands on its own page and sees only the departments it needs. Pick a role to see it as them. In Power BI this is row-level security; on a web page, the same rules sit in the login.
Site
Plant managers
Departments
Built in Power BI or as a web page, fed from the exports and emails your systems already produce. Nothing reads or controls plant equipment. All figures are example data.
Twelve departments of the plant above. Examples, not a menu: the pilot takes one, and the discovery call finds out which.

Weighbridge tickets matched to every load by 7am.

The morning report written the same way every day, by 7am.

Failed loads traced and release packs checked before QA signs.

Work requests by voice note, with the asset and a photo.

Contractor papers checked before anyone arrives on site.

Every lab result checked against the licence limits.

Past trials searchable, with the report and page shown.

Stock near its age limit flagged, export papers checked.

Supplier certificates checked against the spec as they arrive.

Invoices matched to order and goods receipt before anyone sees them.

Customer questionnaires drafted from your approved documents.
Handbook questions answered; with an HR pilot, training and onboarding chased.
Your Microsoft 365 or Google Workspace, plus the automation platform and AI model, set up in your name. Your data stays where it is, and access ends the day the engagement does.
You own the workflows, prompts, documentation and code. Nothing stops working if Mavraq is not renewed.
No juniors, no account manager, no handoffs. The person on the discovery call builds it, which is why Mavraq takes on two or three organisations at a time, not twenty.
A data processing agreement, yours or Mavraq’s. Your security questionnaire answered in writing. Data flows and sub-processors documented. No ISO 27001 or SOC 2 certificate: the controls are documented instead, and you decide whether that is enough for a pilot.
Your standard terms or Mavraq’s, with three things agreed on the purchase order: the payment terms, Mavraq keeping its own templates, and insurance limits that fit a pilot. Governing law is agreed with procurement, and the work is done remotely, with a visit only where a contract calls for one.
About four weeks, one team, one process that costs hours every week. Scope and a fixed price are agreed after a discovery call. The result is measured before and after, in hours and errors. You end with a working system and a written report either way, and the report says what to do next, including nothing.
Week 1
Capacity audit: work with the team, map where the hours go, agree the measure
Weeks 2 and 3
Build in accounts you own, tested on real cases with the people who do the work
Week 4
Live for one team with daily checks, then the before-and-after report and handover
About five days of James's time, spread over four weeks. The gaps are on purpose: your IT team has time to grant access and check the setup, and your team keeps doing its job. A bigger process takes about ten days over six weeks.
A pilot on one team usually comes to €8,000 to €9,000, fixed before it starts. Stopping after week one costs €2,500. Clients outside the euro area are quoted in their own currency.
If the audit finds nothing worth building, you choose: stop there and keep the report, or move the pilot to another team, and the first week counts towards it.